59480 BOILER COMMISSIONING KIT

FER59480 MFG #: BCK
  • Manufacturer Name: Fernox
  • Specifications
  • Description
  • Boiler Commissioning Kit
  • Item Commissioning Kit
  • Used On Item Central Heating Boiler System
  • Kit Content (1) Fernox Protector F1 17.6 Oz, (1) Fernox Cleaner F3 17.6 Oz,(4) Fernox pH Test Strips, (2) Fernox 60 Second Protector Check Strips, Instruction Leaflet
Good Practice Dictates that Hydronic Central Heating Systems Should be Thoroughly Cleaned and Flushed Before Installing a New Boiler, After Which a Chemical Inhibitor Should be Added to Ensure the System is Protected from Corrosion, Scale and Sludge Build-Up; These Procedures Should also be Employed when Major Work is Carried Out on a System; A Clean, Protected System Helps Ensure that the Heat Generated by the Boiler is Transmitted Efficiently Into the House Over the Long Term; Maintain the Design Specification and Energy Efficiency; Restore Energy Efficiency; Inhibit the Formation of Scale and Sludge; Minimize Corrosion of System Metals; The Fernox Boiler Commissioning Kit is Supplied as with Full Instructions and is Non-Hazardous Reagents